Client: MURRAY IRRIGATION
Location: JIMARINGLE & COCKRAN CREEK
Completed: AUG 2024 – DEC 2024
This project involves the improvement of the health & connectivity of floodplain ecosystems by upgrading infrastructure to facilitate higher flows into the Ephemeral Creeks & wetlands of the Edward-Wakool river system. Improving the long term viability of the network.
Works include installation of box culverts, low level crossings, pipe & headwalls