Client: Goulburn Murray Water
Location: GMW-CP-1225 LODDON
Completed: July 2020
Project Value:
Farm channel upgrade to increase water delivery capability to 100MG/day. 1200mm reinforced concrete pipe
(RCP) was installed through the road reserve & road, into existing farm channel. TMP/MOA road closure & traffic
management were utilised. Deep excavation was required to obtain correct depths. Road was rebuilt in layers
(from a depth of 3 meters) with class 3 rock, with a final 300mm layer of compacted class 2 rock. Compaction
tested to 98% modified. Reshaping of swale drains & reinstatement of road reserve.